Air-Driven Spray Foam Insulation Equipment

  • Variable Ratio Spray Foam Insulation Equipment JHPK-IIIB235
  • Variable Ratio Spray Foam Insulation Equipment JHPK-IIIB235
Variable Ratio Spray Foam Insulation Equipment JHPK-IIIB235Variable Ratio Spray Foam Insulation Equipment JHPK-IIIB235
Variable Ratio Spray Foam Insulation Equipment JHPK-IIIB235
  • Product description: Engineered for Polyol and Isocyanate that require a range or difference in volumetric ratio, the IIIB235 Variable Ratio Spray Foam Insulation Equipment allows you to spray ratios from 1:1 to 2:1.
  • INQUIRY

Engineered for Polyol and Isocyanate that require a range or difference in volumetric ratio, the  IIIB235 allows you to spray ratios from 1:1 to 2:1. The system provides infinitely adjustable volume ratio – the operator can dial in the exact volume ratio to adjust the A and B pumps to dispense the correct amount of material.


For applications that require a range or difference in volumetric ratios

Well suited for test labs for material suppliers or original equipment manufacturers


Technical Data:

Ratio of raw materials

1:1~2:1

Viscosity range  of raw material

200-1000 CPS (under operation temperature)

Output of raw materials

2-6.8kg/min

Heating temperature range

 0~6032~140℉)

Electrical source

1 phase 220V 50HZ, it can be changed according to clients’ demand

Compressed air

0.5~0.8Mpa 0.9m³/min

Output pressure of raw material per group

5~10Mpa

Standard Configuration:

Main equipment

1set

Nozzle

1pc

Heating tube per group

15 meter (standard)

Max. length (optional)

45 meter

Short tube with nozzle per group

 1.5 meter

Feeding pump

2 sets

Shipping Parameter:

Volume: 1000*900*1550(mm)

Weight: 330kg

Payment term : 100% T/T in advance

Trade term : EXW or FOB or CFR or CIF

Packing details : plywood tray ; it can be transported to any country directly without other new packaging .

Delivery time :we always have our machine in stock ,so we will ship the spray foam insulation equipment when the payment is confirmed if customers’ do not need the change the voltage ; and it will needs about fifteen working days to change the voltage if it is needed .