Air-Driven Spray Foam Insulation Equipment

  • Spray Foam Insulation Equipment JHPK-H30
  • Spray Foam Insulation Equipment JHPK-H30
  • Spray Foam Insulation Equipment JHPK-H30
Spray Foam Insulation Equipment JHPK-H30Spray Foam Insulation Equipment JHPK-H30Spray Foam Insulation Equipment JHPK-H30
Spray Foam Insulation Equipment JHPK-H30
  • Product description: H30 spray foam insulation equipment has obtained CE certification, safe and environmental protection.
  • INQUIRY
H30 spray foam insulation equipment has obtained CE certification, safe and environmental protection.

Having the proprietary property rights in design and production, several national patents have been applied and approved.

The perfect coaxial structure design of the horizontal booster pump reduces greatly the abrasion of the sealing. There is no pressure difference during operation and the commuting pressure fluctuation value is ideal and stable.

The lubricant inside the anti-solidifying lubricating cylinder circulates with high speed so that the leaked material and impurities could be brought away rapidly. The shaft for black material is always kept in the lubricant avoiding the crystallization.

The delicate coupling structure is easy for the dismounting of the booster pump during the maintenance. When necessary, the complete unilateral raw material pump can be replaced to change the proportion of the raw material.

The pneumatic commuting control assembly is simple in structure and reliable in operation, and enables the pump body operating normally during the lack of electricity.

The design and application of the reset function when shut down realizes the dual protection.

The dual filters of the spray foam insulation equipment for both high and low pressure and the filter of the nozzle realize the triple filtration protection for the raw material and reduce the blocking.

The special armoured temperature sensor inside the heater can collect the temperature signal at any time, hence the overshooting value for heating is well controlled.

The flagelliform armoured temperature sensor inside the heating tube makes the collection of the temperature data more sensitive and accurate without signal losing.

The heating tubes adopt special technology for winding the heating copper belt. The heating is even and reliable. The tubes are safe and durable with full closed water-proof connection, as well as the heat insulation layer and anti-abrasion layer.

The accurate action counter makes it easy to have the knowledge of material consumption when stop working.

The compact control panel and the operation hint of key parts make it easy for fast handling and operation.

The spray foam insulation equipment frame uses the solid rubber wheel dispensing with air filling which is more suitable for the construction site.

The spray foam insulation equipment is of humanization design with low weight, small volume. It is convenient and flexible and can contain 4 groups of heating tubes (90 meters). It can be easily shifted by one person.

Technical Data:

Ratio of raw materials

1:1 standard fixed ratio

Viscosity range  of raw material

200-1000 CPS (under operation temperature)

Output of raw materials

2-8kg/min

Heating temperature range

0~7032~158℉)

Electrical source

3 phase 4 wire, 380V 50HZ, it can be changed according to clients’ demand

Compressed air

0.5~0.8Mpa 1m³/min

Output pressure of raw material per group

5~13.8Mpa

Standard Configuration:

Main equipment

1set

Nozzle

1pc

Heating tube per group

15 meter (standard)

Max. length (optional)

90 meter

Short tube with nozzle per group

1.5 meter

Feeding pump

2 sets

Shipping Parameter:

Volume: 1000*900*1550(mm)

Weight: 243kg

Payment term : 100% T/T in advance

Trade term : EXW or FOB or CFR or CIF

Packing details : plywood tray ; it can be transported to any country directly without other new packaging .

Delivery time :we always have our machine in stock ,so we will ship the spray foam insulation equipment when the payment is confirmed if customers’ do not need the change the voltage ; and it will needs about fifteen working days to change the voltage if it is needed .